E&I Project Estimator

  • الجبيل
  • دائم
  • دوام كامل
  • قبل 21 يوم
estimate cost for
Inspect the panel for any overheating signs, clean the panel, do tightness in all power and control connection.
? Conduct functional check for all circuit, confirm alarm is reaching to DCS for all of them.
? All recommended Dry type transformer testing shall be conducted like Tan Delta, TTR, W resistance...etc.
? Confirm AC is working properly.
? Temperature controller functional test to be checked for auto cut.
? Certify satisfactory installation and prepare final report.

Expatriates